Used Self Erect Cranes Florida - Usually the base that is bolted into a large concrete pad provides the necessary support for a tower crane. The base is attached to a tower or a mast and stabilizes the crane that is affixed to the inside of the building's structure. Often, this attachment point is to a concrete lift or to an elevator shaft.
The crane's mast is often a triangulated lattice structure that measures 0.9m2 or 10 feet square. Attached to the very top of the mast is the slewing unit. The slewing unit consists of a gear and a motor that enable the crane to rotate.
Tower cranes are able to have a maximum unsupported height of eighty meters or two hundred sixty five feet. The tower crane's maximum lifting capacity is 16,642 kg or 39,690 lbs. with counter weights of twenty tons. Moreover, two limit switches are utilized to be able to ensure the driver does not overload the crane. There is even another safety feature known as a load moment switch to make certain that the driver does not surpass the ton meter load rating. Last of all, the tower crane has a maximum reach of two hundred thirty feet or 70 meters.
Due to their extreme heights, there is a science involved to erecting a crane. The stationary structure will at first need to be transported to the construction site by using a huge tractor-trailer rig setup. After that, a mobile crane is utilized in order to assemble the equipment portion of the jib and the crane. Then, these parts are connected to the mast. The mobile crane then adds counterweights. Crawler cranes and forklifts may be a few of the other industrial machinery which is used to erect a crane.
When the building is erected, mast extensions are added to the crane. This is how the crane's height is able to match the building's height. The crane crew utilizes what is known as a climbing frame or a top climber which fits between the slewing unit and the top of the mast. A weight is hung on the jib by the work crew so as to balance the counterweight. Once complete, the slewing unit could detach from the top of the mast. In the top climber, hydraulic rams are utilized to adjust the slewing unit up an extra twenty feet or 6.1m. Then, the driver of the crane utilizes the crane to insert and bolt into position one more mast section piece.
Self Erect Cranes PDF